24 May 2009

Roving Room Roof Fully Completed

My roving room roof had finally been completed. All the plastering are in place. Plastering cannnot be done in one shot. The cement plaster have to stick to the chicken wire mesh first. The workers have to dab the cement plaster to the chicken wire and wait for the cement to set before continuing on the second dab and subsequent plastering.

Plastering work in progress - Back View

Plastering in progress - Frront View

As solid as a rock after plastering

Plastering completed - Back view

Plastering completed - Front View


Completed roof seen from a distance

Close-up of the completed roof

12 May 2009

Roving room roof ready to receive a coat of cement plaster

I have been busy this few days supervising my workers putting up the roof covering over the roof structure. It have been a tedious job having to work above the air well. In future, having to do it again I would rather do it on the ground and using a mobile crane to lift it up provided there are working space on the ground. The shape of the roof resemble a turtle. Perhaps this can overcome the nostalgia of the missing turtles at Rantau Abang and the turtle at the roundabout in Ladang. So, if you miss the turtles, welcome to The Hollow. I am waiting anxiously to see the cement being cast onto the top of the roof. I have taken quite a number of shots on the process of putting up the roof covering for the readers to see together with shots of the surrounding works in progress. I intend to turn the surrounding into a garden with ponds, fountains and fishes. This is my dream and I hope will become a reality soon and I hope the swiftlets will share my dream and help to produce more nests. Since the roving room have been covered up. I did a test on the temperature and humidity by placing a hygrothermometer on the 3rd Floor and the result shows 28 degree celcius for the temperature and 85% for the humidity. This is achieved without the internal drainage, the pools and the fountains.


View from the back. Aluminium foil on top of pvc sun-shading
mesh. The main intention is to keep the aluminium foil taut
and aslo unintentionally act as double heat protection

View from the front. Aluminium foil is placed
on top of pvc sun-shading mesh.

View from the back. Aluminium foil
and chicken wire mesh in place


View from the front. Aluminium foil and
chicken wire mesh in place

View of the top entrance. Actual entrance partly hidden

View of the bottom entrance. the swiftlet can choose
either way to enter. Top or bottom.


Entrance into roving room and air-well below. Wall to block light
from entering building. There will be a door in between the wall



Inside of roving room


Flower trough and pond in front of the entrance

Plastering of flower trough and pond wall in progress

30 March 2009

Roof already topped-up


Today, my workers finished topping-up the roof. My next move is to construct the roving room above the void on the roof top. Besides the roving room my workers will also construct the flower trough surrounding the roof and the separation walls for the pools. I will have pools and moat around the roving room. Watch up for these features in my future post.

A layer of BRC laid on aluminium foil

Roof ready to receive concrete

Concreting in progress

Roof finally topped-up with concrete

"Everyone has talent. What is rare is the courage to follow the talent to the dark place where it leads." - Erica Jong


15 February 2009

A unique project

Today, I would like to share with my readers a unique project which I was entrusted to do. It is something of a challenge to me as this is not on the upper floor of a shophouse. The fact is it is inside the roof of one the buildings in town, a a swiftlet central area, which I will not reveal the location, for security and confidential reasons. The roof is full of trusses but I found the middle portion which can accomodate a swiftlet shelter and the size if equivalent to 1 floor of the shophouse. The roof is already insulated with aluminium insulation paper and wood wool but the temperature is still above the allowable limit for hosting swiftlet The humidity is the opposite, that is, below the allowable limit. Thus, it will be a challenge to get the temperature and humidity to the desired setting.

The entrance hole will be covered up (sheltered) from
the top and swiftlets enter through the
triangular portion which is left opened.
Side view of roving area.

View of nesting roon from entrance into nesting room. Partition
wall in front to further block light going deeper into nesting room

Another view of entrance into nesting room
taken from inside nesting room

View of nesting room taken from far end of nesting room

Nesting planks (single and 2 tier combined) and gypsum plaster ceiling
board. Gypsum plaster board chosen instead of cement board is because
it is more cooling and swiftlets prefer gypsum or lime to cement