Ground Beam in Progress - Day 2













My workers continued with fixing the soffit and side formworks for the ground beam and have covered almost half of the building today. After the formworks are in place, the steel reinforcement will be fixed into the formwork before concrete are poured into it. Besides the ground beam, my workers have to construct the ground slab at the same time. The ground slab will be suspended above ground and located in the middle and back middle panels.